The inground pool installation process, phase by phase

Inground pool installation starts with design and permitting. Once permits are pulled from your city's building department, excavation begins. The excavation phase is the most disruptive — we're moving significant material and need access to the backyard. After excavation, the shell phase depends on pool type: fiberglass shells are delivered by crane and lowered into the hole, which takes 1 to 2 days. Gunite or shotcrete shells are built in place over 2 to 4 weeks, requiring rebar placement, shotcrete application, and cure time before finishing.

After the shell, plumbing and electrical rough-in connects the pool to the equipment pad. Inspections happen at each structural phase — we schedule and manage these. Then pool finish (plaster, pebble, or quartz), coping installation, and decking. The equipment pad is built and equipment installed. Finally, the pool is filled, equipment commissioned, and water chemistry established. We give you a walkthrough of system operation before we close out the project.

Site considerations: soil, access, and utility locations

Not every backyard is equally easy to excavate. Davis County has a mix of soil conditions — clay-heavy foothills near the Wasatch Front, rockier ground in some Farmington Bench and Kaysville areas. We do a site assessment before quoting to understand what we're dealing with. Rocky excavation or high clay content can add cost; we find out before we start, not after we're a foot into the dig.

Access is the other factor. Our excavation equipment needs to enter the backyard — typically through a gate or across a yard. Narrow access, steep slopes, or limited clearance from structures require different equipment choices or additional planning. Utility locates are called in before any excavation — Utah's 811 call-before-you-dig requirement applies, and we don't skip it. We want to know exactly where water, gas, power, and irrigation lines run before the first bucket of soil moves.

Inground Pool Installation Pricing in Utah

Complete inground pool installation costs in Davis County. All-in means permit, excavation, shell, plumbing, electrical, equipment, finish, and decking.

Fiberglass inground pool (installed)

Mid-size shell, excavation, full equipment package, concrete deck

$45,000 – $75,000

Gunite/shotcrete custom pool

Custom shape, premium finish, full equipment, pavers or concrete deck

$70,000 – $150,000+

Paver or travertine pool deck

Premium decking alternative to standard concrete

$15 – $40 / sq ft

Ready to talk about your pool project?

We'll do a site assessment and give you a real number — not a range from a website.

Get a Quote →

Inground Pool Questions

Common questions about pool excavation, timelines, and soil conditions in Davis County.

01How long does inground pool installation take?

Fiberglass pool installations typically take 6 to 10 weeks from permit approval to water-in. Gunite or shotcrete custom pools take 10 to 16 weeks. Variables include weather (we can't shotcrete in freezing temperatures), inspection scheduling, and soil conditions. We provide a project schedule at the start and update you when anything changes.

02What happens during pool excavation?

Excavation is typically the noisiest and most disruptive phase. We bring in an excavator to dig the pool hole to the dimensions specified in the plans. Excavated material is trucked off-site. The hole is then inspected for soil conditions before we proceed. Access to the backyard needs to be clear for equipment — we discuss access logistics before scheduling the excavation crew.

03Does soil type affect pool construction in Davis County?

Yes. Clay-heavy soil (common in the Wasatch Front foothills) can present excavation challenges and also creates drainage conditions that affect the pool shell over time. We take soil conditions into account in the pool design — particularly with fiberglass pools, which require a gravel backfill and specific drainage provisions in clay-heavy soils to prevent the shell from floating or shifting.

04What permits are required for an inground pool in Utah?

All inground pools require a building permit from your city or county building department. Most jurisdictions also require electrical permits for pool bonding and equipment. Barrier/fence requirements are typically also regulated — Utah state code and local ordinances require fencing around pools to limit access by young children. We pull all required permits and know the requirements for Farmington, Kaysville, Bountiful, and surrounding cities.

05When is the best time to start a pool project?

January and February for design and permitting, with excavation starting in March or April, gives you the best chance at having the pool ready for June. Spring slots fill fast — we typically book through summer by April. If you want a specific completion date, reaching out 4 to 6 months in advance is the right move.

Inground Pool Installation — Davis County, Utah

Excavation to water-in — one contractor, one project.

What our clients say about inground pool installation

★★★★★5.040+ Google Reviews
Pro Landscaping of Farmington, UtGoogle Business Profile
Verify on Google
AM
Ammon MorrillSalt Lake · 5 reviews
★★★★★

The real deal. I love the new pool

KB
Kilee BilbroOrem · 1 review
★★★★★

it was an amazing job, did exactly what i wanted

EA
Ellie ArnettFarmington · 2 reviews
★★★★★

My yard looks so good!!

Inground Pool Service Areas in Utah

We serve Davis County, Weber County, Salt Lake County, and Utah County.

The process

How to get started.

Three simple steps from first call to finished job.

01

Contact Us

Complete the quick form to share your needs. We respond the same day — often within an hour.

Get free quote
02

Schedule Your Estimate

We'll arrange a visit at a time that works for you and provide an in-person, plain-english estimate.

Get free quote
03

Get the Job Done

Once approved, we schedule a date and work hard to exceed expectations. If it's not right, we come back.

Get free quote
Visit us

Request a
free quote.

Address
286 S 200 W #234, Farmington, UT 84025